RINRO年度拜访 | 聚焦技术协同,共探行业未来——凝龙幕墙拜访典型材......
279
2025年6月28日,广州凝龙工程技术咨询有......
RINRO荣誉 | 凝龙荣膺2025全国幕墙设计及顾问咨询 “20强”
307
近日,2025第四届全国幕墙设计及顾问咨询“......
333
岁聿云暮忆耕耘,凝心聚力结硕果。幸得同仁共奋......
803
5月21日,赵家镇“天府菌都交易中心”项目全......
Society Certification | Mr. Chen Zha......
1625
学会认证 | 凝龙合伙人陈湛二先生入选广东省......
Yungang City Exhibition Hall | The ......
1773
本项目位于白云新城核心区,倚傍白云山畔,享C......
RINRO | By the end of 2022, Rinro ba......
1774
为了丰富员工们的日常生活,提高员工的身体素质......
The Rinro team visited and studied t......
1825
凝龙团队参观学习第三十届国际门窗展览会
T......
光明玉塘A607-0888号地块项目

本项目位于深圳市光明区光侨路大道与银塘路交汇处东南侧,总建筑面积13.4万平方米,建筑最高100m。
该地块所在的长圳片区,未来将建设四大住宅项目、三个集中商业配套、若干公园以及一所初中,最近的地铁站是6号线长圳站。
旁边是深圳大学附属实验小学、长圳儿童公园。光明勤诚达K+广场已经开业,生活配套齐全。整体氛围透明流畅,彰显非凡气度。
The project is located in the southeast of the intersection of Guangqiao Road Avenue and Yintang Road, Guangming District, Shenzhen, with a total building area of 134000 square meters and a maximum building area of 100m.
In the Changzhen area where the plot is located, four residential projects, three centralized commercial facilities, several parks and a junior high school will be built in the future. The nearest subway station is Changzhen Station of Line 6.
Next to it are Shenzhen University Affiliated Experimental Primary School and Changzhen Children's Park. Guangming Qinchengda K+Plaza has been opened with complete living facilities. The overall atmosphere is transparent and smooth, showing extraordinary bearing.

项目主要幕墙系统为:金属幕墙、石材幕墙、铝板幕墙、采光顶系统、百叶及格栅等。
The main curtain wall system of the project are:metal curtain wall, stone curtain wall, aluminum panel curtain wall, skylight system , louvers and grille, etc.
光明凤凰A503-0095号地块项目

本项目位于深圳市光明区与光侨路交汇处,包含塔楼五栋及底商,总建筑面积约15.3万平方米,建筑最高100m。
项目靠近光明高铁站,附近有光明图书馆,周边有特发观月台、龙光玖瑞府等。
The project is located at the intersection of Guangming District and Guangqiao Road in Shenzhen, including five towers and the ground floor. The total building area is about 153000 square meters, and the maximum building area is about 100m.
The project is close to Guangming High speed Railway Station, Guangming Library is nearby, and there are special development platform, Longguang Jiurui Mansion, etc.


项目主要幕墙系统为:铝板幕墙、石材幕墙、金属幕墙、采光顶系统、百叶格栅等。
The main curtain wall system of the project are:Aluminum panel curtain wall, stone curtain wall, metal curtain wall, skylight system, louvers grille, etc.
其中各项材料统计信息为:玻璃面积约为5.6万平方米,其他幕墙系统材料面积约7000平方米。