Expertise​     专长

Rinro is committed to researching the advanced technology of building curtain wall engineering, providing high quality architectural curtain wall engineering design and consulting work for owners and architects; providing customers with various curtain wall system design, structural calculation, quality control and process management; The function, structure, detail, materials, cost and other aspects of the curtain wall provide accurate technical support for developers and architects. It has direct significance for improving the performance advantages of the building, scientifically controlling the cost and guaranteeing the construction period; with system development and structural analysis. , engineering management, cost control and other comprehensive technical strength; provide professional technology in system energy conservation, structural analysis, material analysis, cost control, construction combination, engineering supervision.


凝龙致力于研究建筑幕墙工程先进技术,为业主与建筑师提供高质量的建筑幕墙工程设计与咨询工作;专业为客户提供各种幕墙系统的设计、结构计算、品质控制和流 程管理;在建筑幕墙的功能、结构、细部、材料、成本等各个方面为开发商、建筑师提供准确的技术保障,对于提高建筑的性能优势、科学控制成本、保障工期具有直接的意义;具备系统开发、结构分析、工程管理、成本控制等全方位的技术实力;在系统节能、结构分析、材料分析、成本控制、施工组合、工程监管等方面提供 专业技术。


Schematic Design 方案设计​​​​

During schematic design, Rinro will assist the architect and the design team in establishing the performance criteria of the façade. This will include evaluation of the design options that could prevents surprises in the later phase of the design such as when features or visual elements are “discovered” to be unworkable or cost prohibitive. With our input, these issues are addressed before the design evolves too far.

在方案设计阶段,凝龙将协助建筑师和设计团队确立外墙的性能标准。这一项服务包括了对设计方案的评估。此项评估将有效预防下一阶段的设计中产生的某些不必要的意外发生,例如不可行的或是成本过高的设计。

Design Development 深化设计

At this stage, Rinro will further improve the design node of exterior wall. Through solid 3D map and SU effect simulation, we will thoroughly optimize the construction drawing design, avoid the defects of the later feasibility of the construction plan, and lead to the repeated modification of drawings, so as to ensure the progress of the construction drawing design process.

在此阶段,凝龙将深入完善外墙设计节点,通过实体三维图,SU效果图的模拟,彻底优化施工图设计,避免后期方案施工可行性的缺陷而导致图纸反复修改,保证施工图设计过程的进度。

Construction Document 招标文件

Rinro will prepare a complete set of bidding documents and contract documents. These documents include system typical detail for various curtain wall systems, technical performance descriptions, and simulation ranges. Rinro will cooperate with the design team to ensure the integrity of the documents.


凝龙将准备好一套完整的招标文件及合同文件。这些文件包括各种幕墙墙型的系统节点,技术性能说明以及模拟范围。凝龙将配合设计团队,以确保文件的完整。

Structural calculation 结构计算

At this stage, Rinro will deeply check the main materials of the curtain wall joints, such as panel (glass, stone, aluminum, etc.), member (aluminum column, aluminum beam, steel keel, etc.), bracket type (connecting support, Embedded parts, etc.), energy-saving (U value, SC value, glass optical parameters, etc.), and even curtain wall wind pressure, ventilation, thermal fluid dynamics analysis, etc., to complete the external wall design detail.

在此阶段,凝龙将深入校核幕墙节点的主要材料,如面板类(玻璃,石材,铝板等),龙骨类(铝立柱,铝横梁,钢龙骨等),码件类(连接支座,埋件连接等),节能类(U值,SC值,玻璃光学参数等),甚至幕墙风压,通风,热工流体动力学分析等,以完善外墙设计节点。

Mock Up 四性试验

After completing the external wall construction documents, Rinro will submit the inspection report of the PMU test construction drawing and observe the test process of the wind and rain test, and record the test results in time.


在完成外墙施工文件后,凝龙将提交四性试验施工图审核意见并观察风雨试验的测试过程,及时记录测试结果。

Tendering 招标统筹

Rinro will assist customers and bidding teams to select the best project contractor. At the pre-qualification stage of the bidding, Rinro will conduct a technical assessment. In addition, Rinro will review the technical documents related to the contract submitted by the bidder. During this period, Rinro will also participate in the technical target meeting to determine the bidder's understanding of the project.

凝龙将协助客户和招标团队选择最优的项目承包人。在投标资格预审阶段,凝龙将进行技术评估。再者,凝龙将审核投标商提交的与合同相关的技术文件。在此期间,凝龙还将参加技术标见面会以确定投标人对于项目的理解。

Inspections 安装检验

During the construction phase, Rinro will inspect the processing and assembly of the factory, the construction of the site, and the process of recording and filming, assembling, and on-site testing. 


在施工阶段,凝龙将视察工厂加工组装,工地施工情况,并且将记录和拍摄制作,组装,现场测试这一过程。

Drawing Review 图纸审核

After the model passes the test, Rinro will review it according to the model drawings and specification, and submit the shop drawing and estimation file. In addition to the accuracy of the curtain wall cutting in the construction stage, the three-dimensional space drawing is checked and the typical detail processing drawings is checked to ensure that all the processed parts meet the design requirements of the construction blueprint.

模型通过测试后,凝龙将根据模型图和规格说明进行审核,并提交施工图和估算文件。并跟综施工阶段的幕墙下料准确性,通过校核三维空间放线,检查标准节点加工图,确保所有加工件符合施工蓝图的设计要求。